How to Apply for PM Surya Ghar Muft Bijli Yojana Online: Step by Step

Parveen Punia 6 min read

How to Apply for PM Surya Ghar Online: The Short Answer

You apply for PM Surya Ghar on the national portal, pmsuryaghar.gov.in. You register with your state, your electricity company (discom) and your consumer number, log in, and submit a rooftop solar application. After that the discom approves the feasibility, a registered vendor installs the plant, your net meter is fitted, and the subsidy is paid to your bank account.

You do not have to do all of this alone. A registered vendor can handle the vendor-side steps, but the application is made in your name and the money comes to your account. This guide covers the application itself. For scheme background and eligibility, read our PM Surya Ghar Yojana guide for Gurgaon.

What to Keep Ready Before You Start

Having the basics at hand saves you from stopping halfway. Keep these ready:

  • A recent electricity bill that shows your consumer number
  • A mobile number and an email address you can open during registration
  • Your Aadhaar
  • Bank details for the account that will receive the subsidy, such as a passbook or cancelled cheque

The portal may ask for more, depending on your discom and your case, so treat this as a starting list. One check is worth doing now: the name on your electricity bill should match the name on your bank account. A mismatch is a common reason for a payment to get stuck later.

The Application Steps on pmsuryaghar.gov.in

Here is the journey at a general level. The portal may change its steps, so follow the screens as they appear on the day.

  1. Register on the portal by choosing your state, your discom and entering your consumer number.
  2. Log in with your registered mobile number and complete your details.
  3. Apply for rooftop solar from your login.
  4. Wait for feasibility approval from the discom. For Gurgaon this is DHBVN.
  5. Choose a registered vendor from the portal.
  6. Get the plant installed by that vendor.
  7. Apply for the net meter once installation is done.
  8. Get the commissioning certificate after the discom inspects the plant.
  9. Submit your bank details on the portal, if it asks for them.
  10. Wait for the subsidy to be credited to your account.

Two of these steps need a little care. At the vendor step, ask for the panel brand, model and wattage in writing, and confirm that net metering and portal filing are part of the quoted price. At the net meter step, keep your consumer number and bill handy, because the discom works from them. Once the plant is commissioned, check that the certificate is uploaded before you assume the file is complete.

Do not skip the order. Installing before feasibility approval, or choosing a vendor who is not registered, can put the subsidy at risk. If you want help with the vendor side, our PM Surya Ghar solar installation service explains what we handle.

Who Does What: You, the Vendor, the Discom and the Government

Confusion about responsibility is where most applications slow down. This table keeps it simple.

StepWho is responsible
Registration and application on the portalYou, with vendor help if you want it
Feasibility approvalThe discom
Site survey, design and installationThe vendor
Net meter application and follow-upThe vendor, with your documents
Net meter fitting and inspectionThe discom
Commissioning certificateThe discom, uploaded through the portal
Bank details on the portalYou
Subsidy paymentThe government

The last row matters. The subsidy is paid by the government after its own checks, and no installer can guarantee it. What a vendor can do is use DCR panels, file as a registered vendor and get your net meter commissioned, so that you meet the conditions. Our guide on DCR vs non-DCR panels shows how to check your quote.

Subsidy Slab You Apply Against

Your system size decides the subsidy. It is ₹30,000 per kW up to 2 kW, ₹18,000 for the third kW, and capped at ₹78,000 for 3 kW and above.

System sizeCentral subsidy
1 kW₹30,000
2 kW₹60,000
3 kW₹78,000
5 kW₹78,000
10 kW₹78,000

The subsidy is for homes only. On our 2026 rate card a 3 kW on-grid system is ₹1,80,000, or ₹1,02,000 after subsidy, and a 5 kW system is ₹2,80,000, or ₹2,02,000 after subsidy. The final price is fixed after a site survey. You pay the vendor first and the subsidy comes later, so plan your cash flow or look at solar loan interest rates and EMI in Haryana.

How Long Each Step Takes

Only some steps have a time we can stand behind. The rest depend on the portal and the discom, and we will not guess them.

StepTime
Registration, application and feasibility approvalDepends on the portal and the discom
Installation7 to 30 days
DHBVN net metering15 to 25 working days
Subsidy creditUsually 30 to 45 days after commissioning

Add these up and you can see why a late start is risky. The scheme period ends on 31 March 2027, and the steps run one after another. Apply early, and check the portal for any update. For the paperwork behind the net meter, see the DHBVN net metering documents checklist.

A word on loans: bank loans start from 6% p.a., subject to bank terms. If you finance the system, the bank is a fourth party in the process, so ask your vendor and your bank how the subsidy credit will be handled before you sign.

Mistakes That Cause Delay or Rejection

These are general cautions, not statistics. Most are easy to avoid at the start.

  • Name mismatch between the electricity bill, the application and the bank account
  • Entering a wrong consumer number or unclear bank details
  • Choosing a vendor who is not registered on the portal
  • Installing non-DCR panels
  • Installing before the discom has approved feasibility
  • Leaving the net meter or the commissioning certificate incomplete
  • Starting too close to 31 March 2027

If your subsidy is late, check the status on the portal first. Then ask your vendor to confirm that the commissioning certificate and your bank details are complete.

Your Next Step

Start by gathering your bill, Aadhaar, mobile number, email and bank details, then check your roof and your DHBVN connection. If you would like a free site survey and a written quote that includes the portal and net-metering steps, get a quote from Voltmen Solar. We are an MNRE-registered vendor in Sector 17, Gurugram, and you can call us on +91 9540003075, Monday to Saturday, 9 AM to 8 PM.

Frequently Asked Questions

Where do I apply for PM Surya Ghar online?
You apply on the national portal, pmsuryaghar.gov.in. You register with your state, your discom and your consumer number, log in and submit a rooftop solar application. The portal may change its steps, so follow the screens as they appear.
What do I need before I start the application?
Keep a recent electricity bill with your consumer number, a mobile number, an email address, your Aadhaar and your bank details ready. The portal may ask for more depending on your discom. The name on the bill should match the name on your bank account.
Can I apply through a vendor instead of doing it myself?
Yes, a registered vendor can handle the vendor-side steps, such as the survey, installation and net meter application. The application stays in your name, and the subsidy is paid to your bank account. Always choose a vendor registered on the portal.
How long does it take to get the subsidy?
Installation takes 7 to 30 days and DHBVN net metering takes 15 to 25 working days. The subsidy is usually credited 30 to 45 days after commissioning. Portal and feasibility steps depend on the portal and the discom, so no fixed time can be promised.
How much subsidy will I get?
The subsidy is ₹30,000 per kW up to 2 kW, ₹18,000 for the third kW, and capped at ₹78,000 for 3 kW and above. It is paid by the government to your bank account. The installer does not pay it and cannot guarantee it.
What is the last date to apply for PM Surya Ghar?
The scheme period ends on 31 March 2027. Since feasibility, installation, net metering and subsidy credit follow one after another, start well before that date rather than in the last few weeks, and check the portal for any update.