
PM Surya Ghar Solar Installation Gurgaon
PM Surya Ghar solar installation in Gurgaon by an MNRE-registered vendor: DCR panels, net meter, portal filing and subsidy paperwork handled for your home.
Inquiry for PM Surya Ghar Installation
Technical Specifications
- ServiceSubsidy-eligible home rooftop solar
- Vendor RegistrationMNRE/HR/GUR/2024/082
- PanelsDCR modules for subsidy
- Subsidy₹30,000/kW up to 2 kW, ₹78,000 for 3 kW and above
- Installation Time7 to 30 Days
- Net MeteringDHBVN, 15 to 25 working days
- Subsidy CreditUsually 30 to 45 days after commissioning
- Scheme PeriodEnds 31 March 2027
Why Choose Our PM Surya Ghar Installation?
PM Surya Ghar solar installation in Gurgaon by an MNRE-registered vendor: DCR panels, net meter, portal filing and subsidy paperwork handled for your home.
MNRE-Registered Vendor
Voltmen Solar is registered with MNRE as MNRE/HR/GUR/2024/082, which is a condition for subsidy on a home rooftop system.
DCR Panels for Subsidy
We supply Indian-made DCR modules on subsidy installations, because non-DCR panels do not qualify for the central subsidy.
Portal Filing Handled
We file your application on the national PM Surya Ghar portal and keep the vendor-side steps moving until commissioning.
DHBVN Net Metering
We apply for DHBVN net metering and coordinate meter testing, which usually takes 15 to 25 working days.
Subsidy up to ₹78,000
The central subsidy is ₹30,000 per kW up to 2 kW and ₹78,000 for 3 kW and above, paid by the government to your bank account and not guaranteed by the installer.
Loans from 6% p.a.
Bank loans for the balance start from 6% p.a., subject to bank terms, and the loan page explains how to apply.
Get a Detailed Engineering Audit
Our engineers will visit your site, check shadows, roof or structure and load, and give you a written quote. The survey is free and carries no obligation.
Book My Free AuditPM Surya Ghar solar installation in Gurgaon: what it is and who it is for
PM Surya Ghar solar installation in Gurgaon means fitting a grid-connected rooftop solar system on your home through an MNRE-registered vendor, so that the government subsidy can be paid to your bank account. The scheme is the PM Surya Ghar Muft Bijli Yojana, run through the national portal at pmsuryaghar.gov.in.
It is meant for homes with a domestic electricity connection and a shadow-free roof or terrace. If you own a house, villa or builder floor in Gurgaon, Gurugram or nearby DHBVN areas and pay a regular electricity bill, you are who the scheme is built for. Factories, shops and offices are not covered, and they follow a different route.
Your roof matters as much as your connection. An independent house or villa is the simplest case. On a builder floor with a shared terrace you need the written consent of the other floor owners, and the electricity meter must be in your name. A flat without roof access cannot fit its own plant, and the society can look at a shared plant instead.
This page explains the service itself: what makes an installation eligible, the steps from registration to subsidy, the documents, the prices after subsidy and what can go wrong. For the scheme background and last-date planning, read our guide to the yojana, linked below.
Want the scheme explained from the start? Read the PM Surya Ghar Yojana guide for Gurgaon.
PM Surya Ghar subsidy slab by system size
The central subsidy is fixed per kilowatt and capped. It is ₹30,000 per kW up to 2 kW, ₹18,000 for the third kW, and capped at ₹78,000 for 3 kW and above.
| System size | Central subsidy |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW | ₹78,000 |
| 5 kW | ₹78,000 |
| 10 kW | ₹78,000 |
The subsidy is paid by the government to your bank account. Voltmen does not pay it and cannot guarantee it. The scheme period ends on 31 March 2027.
Many homes have more than one meter, for example a ground floor and a first floor. At our Maruti Kunj site the customer had two meters and we arranged the subsidy on both. Whether a second meter in your home qualifies depends on the connection and the portal, so ask us to check before you plan for it.
A bigger system does not earn a bigger subsidy once you pass 3 kW, so size the plant by your bills and your roof, not by the cap.
What makes a rooftop installation eligible for the subsidy
Three things must be true together. If one is missing, the subsidy can be refused even when the plant works perfectly.
Before you sign any quote, ask for the panel brand, model and wattage in writing, ask to see the DCR documents, and confirm that net metering and portal filing are part of the price. A low quote that leaves these out often costs more later.
- DCR modules: the panels must be made in India with Indian-made cells. Imported non-DCR panels do not qualify.
- An MNRE-registered vendor: the installation must be done and filed through a vendor registered on the national portal. Voltmen is registered as MNRE/HR/GUR/2024/082.
- A commissioned net meter: your discom must fit a bi-directional meter and the plant must be commissioned, with the commissioning report uploaded to the portal.
Not sure whether your quote has DCR panels? DCR vs non-DCR panels and the subsidy.
Step by step: from portal registration to subsidy credit
The journey has eight steps. Some are done by you, some by the discom and some by us. Where there is no confirmed time we say so instead of guessing.
| Step | Who does it | Usual time |
|---|---|---|
| 1. Register on the national portal with your discom and consumer number | You, with our help if you want it | Depends on the portal |
| 2. Feasibility approval | The discom (DHBVN for Gurgaon) | Depends on the discom |
| 3. Choose a registered vendor | You | Your decision, after a free survey |
| 4. Installation of panels, inverter and structure | Voltmen engineers | 7 to 30 days |
| 5. Net meter fitting and inspection | DHBVN, with our application and follow-up | 15 to 25 working days |
| 6. Commissioning report uploaded | Voltmen and the discom | Depends on the discom |
| 7. Bank details entered on the portal | You | Depends on the portal |
| 8. Subsidy credit | The government | Usually 30 to 45 days after commissioning |
Add the blocks together and a project started late has little room before 31 March 2027. Start early and check the portal for updates.
Documents you need for PM Surya Ghar installation
Keep these ready before you register. The portal may ask for more, depending on your discom and your case.
Check that the name on your electricity bill matches the name on your bank account. A mismatch is one of the most common reasons a payment gets stuck.
- A recent electricity bill showing your consumer number and a domestic connection
- Aadhaar of the applicant
- Bank passbook or a cancelled cheque for the account that will receive the subsidy
- Proof that you own the house or have the right to use the roof, such as a sale deed or ownership document
- A recent passport-size photo
- A mobile number and email linked to your portal login
Prices after subsidy for a home in Gurgaon
Our 2026 rate card is for a turnkey on-grid system with panels, inverter, structure, cables, protection and net-metering paperwork. The final price is set after a site survey.
| System size | Rate card | Subsidy | Cost after subsidy |
|---|---|---|---|
| 1 kW | ₹65,000 | ₹30,000 | ₹35,000 |
| 2 kW | ₹1,25,000 | ₹60,000 | ₹65,000 |
| 3 kW | ₹1,80,000 | ₹78,000 | ₹1,02,000 |
| 5 kW | ₹2,80,000 | ₹78,000 | ₹2,02,000 |
| 10 kW | ₹5,20,000 | ₹78,000 | ₹4,42,000 |
You pay the vendor first and the subsidy comes later from the government, so plan your cash flow for the full amount unless you take a loan.
Bank loans start from 6% p.a., subject to bank terms. Rates are floating, so check the current rate with your bank before you decide.
A 3 kW system suits many homes, and above 3 kW the subsidy stays at ₹78,000, so the extra cost of a larger plant is not offset by more subsidy. Choose the size from your last 12 bills and the shadow-free area on your roof. Our engineer will show the working in the written quote.
Want to finance the balance? Solar loans from 6% p.a. for PM Surya Ghar.
What Voltmen handles for you
You deal with one team from survey to subsidy. Voltmen has been in business since 2019, works with more than 40 in-house engineers and does not sub-contract.
- Free site survey, shadow check and a system size based on your bills
- DCR panels, on-grid inverter, galvanised structure and protection on a written quote
- Vendor-side portal steps and the documents the portal needs from us
- DHBVN net-metering application, meter testing and inspection follow-up
- Commissioning, a monitoring app and a handover walkthrough
- Waterless robotic panel cleaning and an AMC, if you want one. AMC price is set after a site survey and plans generally start from ₹1,000 per month
- Warranty cover: 12-year product and 25 to 30-year linear power for panels as per brand, 10-year water seepage structural and 2-year workmanship
Looking at the full home solar service? See our residential solar service.
Why a subsidy gets delayed or rejected
These are general cautions, not statistics. Most delays come from small mistakes that can be avoided at the start.
The subsidy is paid by the government after its own checks. No installer controls it, so be careful with anyone who promises it. If the credit is late, check the status on the portal first, then ask your vendor to confirm that the commissioning report and your bank details are complete.
- Name mismatch: the applicant name on the electricity bill is different from the name on the bank account.
- Non-DCR panels: the modules do not meet the domestic content condition.
- An unregistered vendor: the installer is not registered on the national portal.
- Incomplete net metering: the bi-directional meter is not fitted or the commissioning report is not uploaded.
- Wrong or unclear bank details entered on the portal.
- Waiting too long: the scheme period ends on 31 March 2027.
- Documents that do not match: an address or consumer number on your papers that differs from the electricity bill.
Our PM Surya Ghar record and a real home in Gurgaon
On the national portal, Voltmen has installed 71 systems totalling 291 kW under the subsidy scheme. These figures cover subsidy installations only, as other commercial work is not listed on the portal.
One real example is Maruti Kunj in Gurgaon. The home has two electricity meters, so we installed one 5 kW hybrid system and one 5 kW on-grid system, with the subsidy arranged on both. The panels sit on an elevated structure with a steel walkway for cleaning.

Our Process
How It Works
From your first call to a fully commissioned system — here is exactly what to expect.
Survey and eligibility check
Our engineer visits your home, checks the roof and shadow, reads your DHBVN bill and confirms that your connection is a domestic one that can claim the subsidy.
Portal registration and feasibility
You register on the national portal with your discom and consumer number. The discom approves feasibility, and we help you choose Voltmen as your vendor.
Installation in 7 to 30 days
Our in-house team installs DCR panels, the on-grid inverter and the structure. Installation takes 7 to 30 days, depending on your roof, structure and approvals.
Net meter inspection
We file the DHBVN net-metering application and coordinate testing and inspection. This usually takes 15 to 25 working days.
Commissioning report
Once the net meter is fitted and the plant is synchronised, the commissioning details are uploaded to the portal.
Bank details and subsidy credit
You enter your bank details on the portal. The subsidy is paid by the government, usually 30 to 45 days after commissioning, and is not guaranteed.
Questions Answered
PM Surya Ghar Solar Installation Gurgaon: FAQs
What is PM Surya Ghar solar installation?
It is a rooftop solar system installed on your home through an MNRE-registered vendor so that you can claim the central subsidy. The plant uses DCR panels and a DHBVN net meter, and the subsidy is paid by the government to your bank account after commissioning.
Who is eligible for the PM Surya Ghar subsidy?
Homes with a domestic electricity connection and a usable roof. The installation needs DCR modules, an MNRE-registered vendor and a commissioned net meter. Commercial and industrial connections are not covered, and the portal may ask for more details from you.
How much subsidy will I get for 3 kW or 5 kW?
The subsidy is ₹30,000 per kW up to 2 kW, ₹18,000 for the third kW and capped at ₹78,000 for 3 kW and above. A 3 kW, 5 kW or 10 kW home therefore sees ₹78,000, paid by the government and not guaranteed by the installer.
How much will I pay after subsidy?
On our rate card a 3 kW system is ₹1,80,000, or ₹1,02,000 after subsidy. A 5 kW system is ₹2,80,000, or ₹2,02,000 after subsidy, and a 10 kW system is ₹5,20,000, or ₹4,42,000. The final price follows a site survey.
How long does the whole process take?
Installation takes 7 to 30 days, depending on your roof, structure and approvals. DHBVN net metering then takes 15 to 25 working days, and the subsidy is usually credited 30 to 45 days after commissioning. Portal and feasibility steps depend on the portal and the discom.
What documents do I need?
Keep a recent electricity bill, your Aadhaar, a bank passbook or cancelled cheque, ownership proof for the house or roof, and a photo ready. The portal may ask for more. The name on the bill should match the name on the bank account.
Is the subsidy guaranteed?
No. The subsidy is paid by the government after its own checks, so no installer can guarantee it. What we can do is use DCR panels, file through a registered vendor and get your net meter commissioned, so that you meet the conditions.
What is the last date for the scheme?
The scheme period ends on 31 March 2027. Because installation, net metering and subsidy credit take weeks one after another, start early rather than in the last few weeks. Check the national portal for any update.
Can I take a loan for a PM Surya Ghar system?
Yes. Bank loans start from 6% p.a., subject to bank terms, and rates are floating. Our solar loan page explains the margin, tenure and how the subsidy works with a loan, so you can see the monthly EMI before you commit.
Why choose Voltmen for PM Surya Ghar installation?
Voltmen is MNRE-registered as MNRE/HR/GUR/2024/082 and has installed 71 systems, 291 kW, on the portal under the subsidy scheme. Our in-house engineers do not sub-contract, and we handle the vendor-side portal work and the net-metering application for you.
Related Pages
- PM Surya Ghar Yojana guideScheme background and last-date planning
- Residential solar serviceFull home solar installation in Gurgaon
- Residential solar installation guideSizes, prices and steps for homes
- Solar loans and PM Surya GharLoans from 6% p.a. and how to apply
- DHBVN net metering processSteps and timelines for the net meter
- Get a free quoteFree survey and written quote for your home